Starting 2026 Strong: How to Plan Your ADU the Right Way This Year

Introduction

The beginning of a new year is when smart homeowners take stock, set goals, and make strategic decisions about their property. In San Diego, where housing demand remains strong and ADU regulations continue to evolve, 2026 is shaping up to be a pivotal year for accessory dwelling units.

If building an ADU has been on your radar—even loosely—January is the ideal time to move from “thinking about it” to planning it the right way.

At ADU PALS, we’ve seen firsthand that the most successful ADU projects aren’t rushed. They’re planned early, thoughtfully, and with a clear purpose in mind.

1. Start With the “Why” Behind Your ADU


Before talking design, budget, or permits, the most important question is simple:

What do you want your ADU to do for you?

Common goals we see from San Diego homeowners include:

  • Generating long-term rental income

  • Creating housing for aging parents or adult children

  • Increasing overall property value

  • Gaining flexibility for future life changes

  • Adding a dedicated home office or studio

Your “why” drives every downstream decision—from layout and size to finishes and site placement.

2. Understand What Your Property Can Actually Support

Not every lot is created equal, and zoning rules alone don’t tell the full story.

Early in the planning process, it’s critical to evaluate:

  • Lot size and usable buildable area

  • Access, slope, and existing utilities

  • Fire zone and setback requirements

  • Parking and driveway constraints

  • Sewer and water capacity

This feasibility step saves homeowners thousands of dollars by avoiding designs that look great on paper but don’t work in reality.

3. Plan Around the Permitting Timeline


Even with streamlined ADU rules, permitting in San Diego is not instant.

Typical timelines include:

  • Design & feasibility: 4–6 weeks

  • Permit review: 3–5 months (sometimes longer in fire zones or complex lots)

  • Construction: 5–7 months depending on scope

Starting your planning in January positions you for:

  • Spring or early summer construction starts

  • Better contractor availability

  • Fewer end-of-year bottlenecks at the city

Waiting until mid-year often means delays—and higher stress.

4. Build a Realistic Budget (Not Just a Construction Number)

One of the biggest mistakes homeowners make is focusing only on build cost.

A complete ADU budget should include:

  • Design and engineering

  • Permits and city fees

  • Utility connections or upgrades

  • Construction and finishes

  • Contingency reserves

In 2026, custom-built ADUs in San Diego typically range from $200,000 to $400,000+, depending on size, site conditions, and finishes. Planning early allows you to align scope with financing and long-term ROI expectations.

5. Explore Financing Options Early


January and February are ideal months to line up financing before lender pipelines fill up later in the year.

Common ADU funding strategies include:

  • HELOCs or home equity loans

  • Cash-out refinances

  • Construction or renovation loans

  • Private or blended financing strategies

Securing financing early prevents project delays and gives you leverage when making design decisions.

6. Decide Between Pre-Approved Plans and Custom Design


San Diego now offers pre-approved ADU plans, which can shorten review times for certain properties. However, they’re not always the best fit.

Pre-approved plans work best when:

  • The lot is flat and unconstrained

  • A standard layout meets your goals

  • Speed is the top priority

Custom design is often the better choice when:

  • You want to maximize rental income or resale value

  • The site has slope, access, or fire constraints

  • You’re designing for family or long-term flexibility

The right choice depends on your goals—not just speed.

7. Choose Your ADU Team Carefully


An ADU is not just a construction project—it’s a regulatory and financial one.

The right ADU partner should:

  • Understand San Diego zoning and permitting deeply

  • Design with ROI, livability, and compliance in mind

  • Be transparent about costs and timelines

  • Guide you from concept through completion

    Early conversations matter. The builder you choose in January shapes your entire experience.

Conclusion: The Best ADU Projects Start Early

If 2026 is the year you want to add income, flexibility, or long-term value to your property, planning now is the smartest move you can make.

January isn’t about rushing—it’s about setting the foundation so everything that follows is smoother, faster, and more predictable.

Plan Your 2026 ADU With Confidence

At ADU PALS, we specialize in custom-designed, permit-ready ADUs built specifically for San Diego properties. We help homeowners plan strategically—before they spend a dollar on construction.

Contact ADU PALS now for free consultation!